|
Stage 3 - Directional drilling - In selected cases, rather than using an open trench for pipes, work crews will use small drilling machines to install portions of the pipe network without significantly disturbing the area. This technique is used to protect heritage trees and deal with other restrictions like narrow rights-of-way and decorative driveways. Each drilling operation is usually finished within a few hours. Small piles of dirt and drilling medium at each end of the installed pipe could remain for a longer period. |